7/2/2009
Reed Hollinshead
ITD Communication
208-334-8881
reed.hollinshead@itd.idaho.gov
Motorists should expect traffic restrictions on U.S. 20 near Picabo through Fourth of July weekend
SHOSHONE - Travelers using U.S. 20 between Timmerman and Carey should be prepared for traffic restrictions and road construction near Picabo, the Idaho Transportation Department announced.
U.S. 20 is reduced to one lane between Gannett Road and the Silver Creek bridge east of Picabo (milepost 186 to 192) for a reconstruction project.
Drivers are asked to watch for flaggers throughout the holiday weekend. A pilot car will be used to shuttle traffic through the construction zone and a 35-mph speed limit will be in effect.
The restriction is the result of several soft spots in the road base encountered by construction crews after grinding the top asphalt layer. Excessive holiday traffic has limited the ability of the contractor to make the roadway safer.
Delays of 15 minutes are expected, with longer delays possible during heavy traffic periods. In addition, a 12-foot width restriction remains in effect throughout the construction zone.
ITD and the Idaho State Police warn motorists to slow down and pay attention when driving in work zones, where increased speeding fines and other penalties apply. Motorists are encouraged to plan ahead and dial 5-1-1 or visit 511.idaho.gov for information on the state highway or interstate system.