Southwest Idaho highway construction report for Jan. 22-29

BOISE - The following projects are part of the GARVEE Transportation Program in southwest Idaho, which uses funds from Grant Anticipation Revenue Vehicle (GARVEE) bonds to expedite highway projects.

 

BOISE - Interstate 84, Orchard Street Interchange
Work continues on a project to reconstruct the Orchard Street Interchange in Boise.

 

During the week of Jan. 25, crews will begin working on improvements to Wright Street. Work on Wright Street is expected to be complete by late February.

 

The speed limit on I-84 is 55 mph and shoulders are restricted in the project area. The speed limit on surrounding roadways (Orchard Street, Wright Street, Victory Road) is 25 mph. ITD advises motorists to be cautious of trucks and equipment.

 

Construction is expected to be complete in spring 2010.

 

BOISE - Interstate 84, Vista Avenue Interchange Reconstruction*

Work is under way to rebuild the Vista Avenue Interchange to reduce congestion and accommodate future I-84 lanes.

 

The outside lane will be closed in each direction of I-84 near the Vista Interchange from 10 p.m. tonight (Jan. 22) until 5 a.m. Saturday (Jan. 23). Crews are working on the bridge that spans I-84.

 

One lane will be closed in each direction of I-84 while crews work overnight on the bridge Monday, Tuesday and Wednesday (Jan. 25-27). Work begins at 10 p.m. each night and ends at 5 a.m. the following morning. All lanes will re-open at 5 a.m. Thursday (Jan. 28).

 

The speed limit on I-84 is 55 mph. Watch for trucks entering and exiting the construction zone.

 

Construction is expected to be complete in fall 2010.

 

* Design for the project was funded by GARVEE, but project construction is funded through the federal stimulus program, created to generate jobs and help boost Idaho's economy while upgrading our foundation for future economic growth.

 

BOISE -  Interstate 84, Cole Road to Broadway Avenue widening

ITD is rebuilding and widening east- and westbound I-84 between the Cole and Broadway interchanges in Boise. When complete, the interstate will have four lanes in each direction.

 

Motorists can expect nighttime lane closures on I-84 between the Orchard and Vista interchanges early next week:

 

- The left lane of eastbound I-84 will be closed Monday and Wednesday nights (Jan. 25 and 27) for striping and guardrail work.

- The left lane of westbound I-84 will be closed Tuesday night (Jan. 26) for guardrail work.

 

During this time, motorists should expect slight traffic shifts on the Orchard eastbound on-ramp and eastbound I-84. Crews are preparing the work zone for the next phase of the widening project.

 

The speed limit is 55 mph in the project area on I-84.

 

This project is expected to be complete in summer 2011.

 

MERIDIAN - Interstate 84, Ten Mile Interchange construction

Work continues on a project to replace the current Ten Mile Overpass with an interchange with on- and off-ramps. This project includes widening Ten Mile Road and constructing two undercrossings for local roads north and south of I-84.

 

Ten Mile Road is closed between Franklin and Overland roads until summer 2011.

 

Motorists should watch for trucks traveling in the area.

 

Construction is expected to be complete in summer 2011.

 

NAMPA - Interstate 84, Garrity Interchange Bridge reconstruction

Construction on the I-84 Garrity Interchange improvement project is under way.       

 

The Idaho Transportation Department (ITD) advises motorist to expect the I-84 eastbound passing lane (the lane closest to the median) to be closed overnight Sunday (Jan. 24) between the Franklin and Garrity Interchanges while equipment is set up in the median.

                 

The lane closure will take place between 10 p.m. and 5 a.m, from Sunday night to Monday morning. Both lanes will be open by the morning commute and during the day.

 

ITD also reminds motorists that Garrity Boulevard will be reduced to one lane in each direction near the Garrity Interchange from Sunday night through the next warranted traffic shift.

 

Traffic will be moved to the inside lanes beneath the Garrity Interchange bridges while crews use the outside lanes to install guardrails and work on the bridge abutments. The speed limit has been lowered to 35 on Garrity Boulevard and 55 mph on Interstate 84 (I-84) through the construction zones.

 

At least one lane in each direction will be open on Garrity during daytime hours. Drivers can expect two lanes open in one direction and one lane open in the opposite direction during some of the construction. Many times, two lanes will be open in each direction. The speed limit will be lowered to 35 mph on Garrity and 55 mph on I-84 through the construction zones.

 

The project will remove two bridges on I-84 at the Garrity Interchange and replace them with a single bridge that will accommodate three lanes in each direction on the interstate. Work also includes reconstructing the interstate about a mile east of the interchange to tie into the widening of I-84 between the Garrity and Meridian interchanges, and removing the bridge piers in the roadway at Garrity Boulevard.

 

This project is part of ITD's plans to improve I-84 between the Franklin and Garrity interchanges in Nampa. The completed improvements will include three lanes in each direction from the Franklin to Garrity interchanges, and four lanes in each direction from the Garrity to Meridian interchanges.

 

The project will be constructed in three stages:

 

Stage 1 - Build the median section of the bridge between the existing bridges. Traffic will remain on existing bridges, with two lanes open in each direction.

Stage 2 - Remove existing westbound bridge and build new westbound portion of bridge. Westbound traffic will be moved onto the new median section. Two lanes will remain open in each direction.

Stage 3 - Remove existing eastbound bridge and build new eastbound portion of bridge. Westbound traffic will be shifted onto the new westbound portion of the bridge, and eastbound traffic onto the median section.

Completion - By summer 2011, three lanes will be open in each direction over the bridge, eventually connecting with a fourth lane in each direction east of the interchange.

 

Concrete Placing Co. Inc. of Boise is the contractor of the $15 million project.

 

 

Following is an update on non-GARVEE state highway construction projects in southwest Idaho.

 

CANYON COUNTY
CALDWELL - Franklin Rd. & 21st Ave. reconstruction

A project to reconstruct the roadway and install a new traffic signal is under way at the area of Franklin Road and 21stAvenue in Caldwell. This project will improve sight distance and safety, and align the road to match up with the new five-lane roadway on 21st Avenue.

 

Two intersections are closed to through traffic: at Franklin and Commercial Way, and at Commercial and Specht Avenue. Also, traffic on Franklin Road is shifted slightly; signs there will help direct motorists through the work zone.

 

Crews will install a new traffic signal at the Franklin/21st intersection, and realign Franklin and Commercial to tie into Specht. In addition to intersection work, the project also includes excavation, new asphalt pavement, curb and gutter, storm sewer, sidewalk, lighting, and installation of a 35-foot concrete bridge over the Notus Canal.

 

The Franklin/21st Avenue intersection is about one-quarter mile west of the newly-reconstructed Franklin Road Interchange (Exit 29).

 

The first phase of this project, about a quarter-mile section of 21st Avenue, was rebuilt last summer. The three-lane roadway was widened to five lanes.

 

Work on this phase is anticipated to be complete in September.

 

Central Paving Co. of Boise is the contractor on this $1.66 million project. Central Paving also was the contractor on the work last summer. The City of Caldwell is the local sponsor on this project.

 

GEM COUNTY

EMMETT - Bishop Road Bridge project for Farmers Co-op Canal

A project to build a detour over the Farmers Co-op Canal on the east side of the existing bridge off Idaho 52 is under way. A new bridge will then be constructed, with a new intersection at Bishop Road and Bishop and Bill Burns Road next to the canal.

The project is south of the intersection of Dewey and Bishop roads.

 

Currently the old bridge has been removed, and the contractor is setting rebar and forms and pouring concrete for the second bridge abutment and wing walls. Overall, the project is progressing as scheduled.
 
The traffic control during this project may include flaggers and intermittent minor delays, but at least one lane of traffic will be maintained at all times for drivers to travel through the work zone.

Once work has begun, the contractor must be done with work over the canal by March 15, 2010, and is expected to be completely finished - except grass re-seeding that fall - by early May.

Idaho Sand & Gravel of Nampa is the contractor on the $622,000 project. Gem County is the local sponsor, also participating financially in the project.

 

WASHINGTON COUNTY

WEISER - Snake River Bridge replacement
The Snake River Bridge on the U.S. 95 Spur in Weiser is being replaced with a wider structure. The bridge connects Annex, Ore., to Weiser.

 

Another concrete pour remains, as well as asphalt paving work that requires warmer temperatures, so the new bridge will not be open to two-way traffic until spring. The contractor is continuing to work on the parapet/barrier.

 

The original bridge was built in 1903, with an additional span added in 1911. Traffic signals were added in 1949. The bridge was replaced in the 1950s - that's the one being replaced in this project. Once completed, the bridge will be 16 feet wider and able to carry greater traffic volumes. The highway on both sides of the bridge also will be reconstructed.

New curb, gutter and sidewalks are being reconstructed on the Idaho side of the bridge.

The speed limit is reduced to 25 mph on the Oregon side of the bridge.

Sletten Construction of Boise is the contractor on this $10 million project. The project will extend into spring 2010.

ITD and the Idaho State Police caution motorists to slow down and pay attention when driving in work zones, where increased speeding fines and other penalties apply. Motorists are encouraged to plan ahead and dial 5-1-1 or visit 511.idaho.gov for information on the state highway or interstate system.

 
+