Our Mission. Your Mobility.





1/31/2011

Reed Hollinshead
ITD Communication
208-334-8881
reed.hollinshead@itd.idaho.gov

Willow Creek Bridge on Idaho 16 north of Firebird to be replaced this summer

BOISE - A two-lane bridge north of Firebird Raceway will be replaced with a wider, three-lane structure in a six-month project this summer.

 

The bridge replacement, about eight miles south of Emmett, will result in a significantly wider bridge -- 54 feet wide compared to the current 36-foot-width.

 

In addition to replacing the bridge, built in 1959, the project will require approach work to accommodate the new width of the structure and construction of a temporary detour on the west side of the existing structure to accommodate southbound commuter traffic.

 

Although traffic capacity will be improved in the project, it is primarily being done to address the poor condition of the bridge substructure.

 

NOTE: The Idaho Transportation Department is in charge of all roads within the state highway system - interstates, state highways and U.S. routes. All other roads are the responsibility of the local city or county entity.



ITD and the Idaho State Police caution motorists to slow down and pay attention when driving in work zones, where increased speeding fines and other penalties apply. Motorists are encouraged to plan ahead and dial 5-1-1 or visit 511.idaho.gov for information on the state highway or interstate system.

 
+