Our Mission. Your Mobility.





3/4/2011






Drilling work will cause intermittent lane closures on Idaho 41 in Rathdrum
COEUR d'ALENE - A drilling crew from the Idaho Transportation Department will perform investigative work on Idaho 41 in Rathdrum Tuesday and Wednesday (March 8 and 9) as part of a project that will eventually replace the bridge connecting Idaho 41 with Idaho 53 in Rathdrum.

The work will cause intermittent lane closures between milepost 7.2 and 7.9 (near the Rathdrum Bridge intersection with Idaho 53).

 

Weather permitting, work will be done between 9 a.m. and 2:30 p.m. to avoid interfering with school traffic. The elementary, junior and senior high schools are located on Idaho 41 in Rathdrum. The highway will be reduced to one lane for 15 to 45 minutes at a time. Flaggers and signing will guide motorists through the work zone area.

 

Questions? Visit us online at itd.idaho.gov, or follow ITD on Twitter (IdahoITD) or Facebook. Motorists are asked to slow down in construction zones and pay attention to the road. Safety -  for drivers and workers -  is our top priority.

 
+