Southwest Idaho highway construction report for Feb. 10-17

BOISE - The following projects are part of the GARVEE Transportation Program in southwest Idaho, which uses funds from Grant Anticipation Revenue Vehicle (GARVEE) bonds to expedite highway projects.

BOISE - Interstate 84, Cole Road to Broadway Avenue widening

Just a few weeks remain of the east- and westbound interstate lane closures between the Orchard and Broadway interchanges that began in early January. The speed limit will be 55 mph during these weeks of lane closures.

The lane closures will be in effect while crews work on overhead sign foundations. Motorists can also expect intermittent overnight restrictions, reducing traffic to two lanes from 10 p.m. to 5 a.m.

 - Eastbound I-84 will be reduced to three lanes and one ramp lane between the Orchard and Vista interchanges.
- Westbound I-84 will be reduced to three lanes and one ramp lane between the Broadway and Vista interchanges.

The lane closures are part of a project to widen I-84 to four lanes in both directions between Cole/Overland and Broadway. The widening was completed in the summer of 2011.

Concrete Placing Co. Inc., of Boise, is the contractor on the $35.9 million project.

Following is an update on non-GARVEE state highway construction projects in southwest Idaho.

BOISE COUNTY

EAST OF BOISE - Mores Creek Bridge upgrade

A project to update the Mores Creek Bridge (commonly known as the High Bridge) on Idaho 21 east of Boise is under way.

During this work, the bridge deck and joints will be rehabilitated and the bridge parapet and railing replaced. Work on the foundation during the low-water winter period will include a retaining wall, rock anchoring, slope armoring, and seismic retrofit. Portions of the structural steel will be painted along with other repairs on the structure. 

Traffic across the bridge is controlled by signals at either end, with only one direction allowed to pass through at a time. Under normal conditions, delays are expected to be 15 to 45 minutes in length. In addition, a nine-foot width restriction is in effect.

Crews have placed the lower retaining wall, as well as some of the wire mesh on the west side for the slope armoring, and have completed the drilling operations.

RSCI, of Meridian, is the contractor on the $2.8 million project.

NEAR LOWMAN – Fish-passage project

A fish-passage project east of Lowman is in winter shutdown mode, as the bridge has been reopened to traffic and the speed limit returned to 55 mph. The contractor will return in the spring to re-seed the work area and resume approach work.

This project is being funded through the U.S. Forest Service.??Cannon Builders Inc., of Blackfoot, is the contractor on this $1.2 million project.

PAYETTE COUNTY

PAYETTE – U.S. 95, Payette River Bridge replacement

The project to improve the U.S. 95 bridge over the Payette River south of Payette is under way. It is expected to finish in fall 2012.

Crews are replacing the existing northbound truss bridge (built in 1927) located on U.S. 95 between Fruitland and Payette. The new bridge will be two feet higher off the water. It will have no overhead bracing or struts, as the current one does, and will be 84 feet in width, eliminating current safety concerns regarding both width and height restrictions.

The new bridge will be constructed next to, and will attach to, the existing southbound bridge. The project also includes minor roadway realignment to tie into the new bridge location.

U.S. 95 is the main route connecting northern and southern Idaho. About 18,000 vehicles use this portion of the highway daily. By 2026, the volume is expected to be more than 25,000.

Crews have removed about one-third of the old bridge deck, and have put many of the old girders in place that were in good shape and could be transferred from the old bridge to the new one.

JC Constructors Inc., of Meridian, is the contractor for this $6.17 million project.

 
+