BOISE - A dozen sidewalk and pathway projects benefiting child pedestrian safety will be built this year across the state, thanks to collaboration between the Idaho Transportation Department and the Local Highway Technical Assistance Council, after a legislative effort last year.
The projects are funded with general fund surplus money approved by the Idaho Legislature during the 2017 session.
House Bill 343 was the result of efforts by House Minority Leader Mat Erpelding and House Majority Leadership. It provides ITD and local jurisdictions the authority to spend these funds on child pedestrian safety projects.
There were 71 eligible project applications requesting more than $12 million in funds to consider in this year’s funding cycle. The maximum award is $250,000. Construction will start this spring, and must be completed before the end of the year. The following 12 projects were approved for funding:
Location Amount
Ashton $250,000
Title: Main Street sidewalk improvements
Description: This project will provide new sidewalk and lighting improvements along Main St. (ID-47) to connect with the existing pedestrian system at the high school.
Blackfoot $171,000
Title: Ridge Crest Elementary Safety Improvements Project
Description: This project will provide a 575-foot section of sidewalk along Airport Road to extend the sidewalk from Ridgecrest Elementary to the park. Additional safety improvements include a pedestrian crossing at East Airport Road.
Burley $191,000
Title: Highland Avenue and East 19th Street Sidewalk Connection
Description: This project will provide nearly a half-mile of new sidewalk and Americans with Disabilities Act (ADA)-compliant ramps that connect two schools along Highland Avenue. The schools are White Pine Intermediate and Dworshack Elementary.
Caldwell $109,446
Title: Sacajawea Elementary School Project
Description: This project will provide new sidewalk, updated ADA curb ramps, bike lanes, and streetlights, and a Pedestrian Hybrid Beacon along Illinois Avenue to provide a safe route to school for children travelling to Sacajawea Elementary.
Carey $154,640
Title: Crosswalk Signage and Pedestrian Improvement Project
Description: This project will provide new curb, gutter, and sidewalk along ID-26 and a Pedestrian Hybrid Beacon to provide a safe crossing for pedestrians walking across the state highway.
Driggs $125,000
Title: South 5th Street Pathway
Description: This project will provide approximately 1,600 feet of 10-foot-wide multiuse path and ADA ramps along South 5th Street, connecting four schools to residential areas. This project extends an existing safe route to school.
Firth $250,000
Title: Children Pedestrian Improvements
Description: This project will provide new curb, gutter, and sidewalk along Center Street from Main St. (ID-91) to the elementary school. Additional safety improvements include a Pedestrian Hybrid Beacon signal on Main St.
Idaho Falls $240,000
Title: Iona Street, Riverside Drive and Bush Elementary Connections
Description: This project will provide new sidewalk along Iona Street and a Pedestrian Hybrid Beacon for safe crossings at Riverside Drive (a busy street near an interchange). A second location includes sidewalk connections to Bush Elementary.
Marsing $35,326
Title: ID-55 Sidewalk Project
Description: This project will provide new sidewalk along ID-55, connecting the public library and downtown with the elementary, middle, and high schools.
Moscow $250,000
Title: Third Street Corridor Improvements
Description: This project will provide about 970 feet of new sidewalk along 3rd Street, connecting two elementary schools and the high school along a safe route to school. Additional safety improvements include adding center medians, curb extensions, vertical tube delineator (high-visibility markings), and school-zone lighting.
Shelley $135,000
Title: Locust and US-91 Improvements
Description: This project will install a Pedestrian Hybrid Beacon at the intersection of ID-91 and Locust Street to provide a safe pedestrian crossing for students going to the school or library.
Teton $28,000
Title: Child Pedestrian Safety Project
Description: This project will install Pedestrian Hybrid Beacons at two intersections along ID-33 south of Teton Elementary to provide safe crossing for students going to and from school.