Term Agreement Report

Welcome to the Term Agreement Report. Here you are able to:
  • Search for consultants by districts they are pre-approved for.
  • Search for consultant by categories that they are pre-approved for.
  • Search for consultant by both district and category.
  • Display consultants for all districts.
Simply select the report type, then the districts and/or service categories that you want in the report, or go to the directions page.
Direct all questions and comments to Holly McClure
 
District 1: District 2: District 3: District 4: District 5: District 6: All:
A. BRIDGES & STRUCTURES
A1. Bridge Design
A2. Bridge Inspection
A3. Hydraulics
A4. Load Rating
B. ROADWAY DESIGN
B1. General Roadway Design
B2. Traffic Services
B3. Pathways
B4. Value Engineering
C. SURVEY & MAPPING
C1a. Location Survey - Survey Data
C1b. Location Survey - Survey Control
C2. Construction Survey
C3. Land Survey
C5a. Aerial Mapping - Photogrammetric Mapping
C5b. Aerial Mapping - Surveying for Mapping
C6. Subsurface Utility Engineering
D. ARCHITECTURE
D1. Building Design
D2. Building Inspection
D3. Landscape Design
D4. Interior Design
D5. Mechanical Design
D6. Electrical Design
D7. Structural Design/Analysis
E. ENVIRONMENTAL
E1. Report Documentation/Management
E2. Noise Studies
E3. Air Quality Analysis
E4. Wetlands
E5. Water Quality Analysis
E6. Biological Studies
E7a. Architectural History
E7b. Archaeology
E8. Hazardous Materials/Waste
E9. Visual Assessment
F. TRANSPORTATION PLANNING
F1. Public Involvement
F2. Public Relations
F3. Public Opinion Research
F4. Photography
F5. Videography
F6. Graphic Arts
F7. Studies & Plans
F8. GIS Mapping & Planning
F9. Visualization Services
G. CONSTRUCTION ENGINEERING & INSPECTION
G1. Project Management
G2. Partnering
G3. Value Engineering
G4. Claims Analysis
G5. Audit
G6. Construction Inspection
G7. Construction Materials Testing
H1. PROJECT DEVELOPMENT
H1a. Materials Report Phase 1
H1b. Materials Report Phase 2
H1c. Materials Report Phase 3
H1d. Materials Report Phase 4
H1e. Materials Report Phase 5
H1f. Pavement Rehabilitations
H1g. Geotechnical Engineering
H2. SUBSURFACE INVESTIGATION
H2. Subsurface Investigation
H3. MATERIALS LABORATORY TESTING
H3. Materials Laboratory Testing
H4. NON-DESTRUCTIVE TESTING FOR PAVEMENTS
H4. Non-Destructive Testing for Pavements
J. INTELLIGENT TRANSPORTATION SYSTEMS (ITS)
J1. ITS Planning
J2. ITS Design
J3. ITS Implementation/Deployment
K. AIRPORTS
K1. Airport Planning
K2. Airport Engineering
L. CMGC Support Services
L1. - Construction Manager/General Contractor (CMGC) Support Services