Subcategory Details for 212 Soil Binder - PAM

Name

212 Soil Binder - PAM

Category

Build America Buy America (BABA) certifiable product

No

Description

SUBSECTION 212.03 B - (PAM) TEMPORARY EROSION and SEDIMENT CONTROL MEASURES of the ITD Standard Specifications. See EC-13, EC-14 of the Best Management Practices Manual (BMP). Blends of coagulants and flocculants (polyacrylamide co-polymers or PAM-Anionic, linear, non-cross-linked).

Special Notes

Do not use PAM on a slope that flows into a water body without passing through a: 1)- Sediment Trap Basin, 2) - Sediment Control Retention Basin, 3) - Water Pollution Control Sediment Control Catch Basin, or 4) - Water Pollution Control Sediment & Oil Trap. Requires a manufacturers certification that states product is nontoxic to plant or animal life and nonstaining to concrete or painted surfaces.

Products

Id
Id Name Supplier Categories Subcategories Status
BABA

Loading...

Rows per page:
0-0 of 0