Subcategories
| 212 Soil Binder - Dust Control | SUBSECTION 212.03 B - TEMPORARY EROSION and SEDIMENT CONTROL MEASURES of the ITD Standard Specifications. Also see 612.03.E, 651.03.B, and 711.19. See EC-13 Dust Control & EC-14 Wind Erosion Control of the Best Management Practices Manual (BMP). Dust Control products include Guar, Psyllium, Starch, Tall oil Pitch and Rosin Emulsion, Lignin Sulfonate, Acrylic Copolymers and Polymers, Hydro-Colloid Polymers, Gypsum, Petroleum Resin and Emulsion. (Polyacrylamides see 212 Soil Binder – PAM.) |
| 212 Soil Binder - PAM | SUBSECTION 212.03 B - (PAM) TEMPORARY EROSION and SEDIMENT CONTROL MEASURES of the ITD Standard Specifications. See EC-13, EC-14 of the Best Management Practices Manual (BMP). Blends of coagulants and flocculants (polyacrylamide co-polymers or PAM-Anionic, linear, non-cross-linked). |
| 502 Concrete (Precast Concrete Barrier) | SUBSECTION 502 CONCRETE - PRECAST CONCRETE BARRIER is considered GENERIC by ITD and NOT a QPL Item. See Standard Drawing 612-18. SECTION 626 Temporary Traffic Control of the ITD Standard Specifications, SUBSECTION 626.02 Materials. Also see SECTION 612 Guardrail, SUBSECTION 612.03.B Temporary Precast Concrete Barrier. See 2025 Supplementals |
| 505.03.D - Rebar Chairs | SUBSECTION 503.03.D Placing and Fastening. See 2025 Supplementals |
| 505.03.D - Steel Pipe Pile - 60 Deg Conical Point (Bullet Nose) | SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Conical points for Pipe Piles. Tips are angled 60 Degrees from horizontal and are designed to fit over the end of the pile. |
| 505.03.D - Steel Pipe Pile - 60 Deg Conical Point (Inside Fit) | SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Conical points for Pipe Piles. Tips are angled 60 Degrees from horizontal and are designed to fit inside the pile. |
| 505.03.D - Steel Pipe Pile - Closure Boot | SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Closure boot designed to protect the end of pipe piles driven into dense soil. |
| 505.03.D - Steel Pipe Pile - Open End Cutting Shoe (Inside Fit) | SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Cutting shoe with an open end designed to help pipe piles penetrate dense or hard soils. |
| 505.03.E - Reinforcement Transition Splices | SUBSECTION 503.03.E Splices. See 2025 Supplementals. Used to splice reinforcing steel of different sizes. Cost incidental and included in contract unit price for metal reinforcement. |
| 505.03.H - Splicing for Steel H-Piles | SUBSECTION 505.03.H Splicing. Pre-fabricated splicers for splicing steel H-piles. |