212 Soil Binder - Dust Control

SUBSECTION 212.03 B - TEMPORARY EROSION and SEDIMENT CONTROL MEASURES of the ITD Standard Specifications. Also see 612.03.E, 651.03.B, and 711.19. See EC-13 Dust Control & EC-14 Wind Erosion Control of the Best Management Practices Manual (BMP). Dust Control products include Guar, Psyllium, Starch, Tall oil Pitch and Rosin Emulsion, Lignin Sulfonate, Acrylic Copolymers and Polymers, Hydro-Colloid Polymers, Gypsum, Petroleum Resin and Emulsion. (Polyacrylamides see 212 Soil Binder – PAM.)

212 Soil Binder - PAM

SUBSECTION 212.03 B - (PAM) TEMPORARY EROSION and SEDIMENT CONTROL MEASURES of the ITD Standard Specifications. See EC-13, EC-14 of the Best Management Practices Manual (BMP). Blends of coagulants and flocculants (polyacrylamide co-polymers or PAM-Anionic, linear, non-cross-linked).

502 Concrete (Precast Concrete Barrier)

SUBSECTION 502 CONCRETE - PRECAST CONCRETE BARRIER is considered GENERIC by ITD and NOT a QPL Item. See Standard Drawing 612-18. SECTION 626 Temporary Traffic Control of the ITD Standard Specifications, SUBSECTION 626.02 Materials. Also see SECTION 612 Guardrail, SUBSECTION 612.03.B Temporary Precast Concrete Barrier. See 2025 Supplementals

505.03.D - Rebar Chairs

SUBSECTION 503.03.D Placing and Fastening. See 2025 Supplementals

505.03.D - Steel Pipe Pile - 60 Deg Conical Point (Bullet Nose)

SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Conical points for Pipe Piles. Tips are angled 60 Degrees from horizontal and are designed to fit over the end of the pile.

505.03.D - Steel Pipe Pile - 60 Deg Conical Point (Inside Fit)

SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Conical points for Pipe Piles. Tips are angled 60 Degrees from horizontal and are designed to fit inside the pile.

505.03.D - Steel Pipe Pile - Closure Boot

SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Closure boot designed to protect the end of pipe piles driven into dense soil.

505.03.D - Steel Pipe Pile - Open End Cutting Shoe (Inside Fit)

SUBSECTION 505.03.D Pile Tips and Cutting Shoes. Cutting shoe with an open end designed to help pipe piles penetrate dense or hard soils.

505.03.E - Reinforcement Transition Splices

SUBSECTION 503.03.E Splices. See 2025 Supplementals. Used to splice reinforcing steel of different sizes. Cost incidental and included in contract unit price for metal reinforcement.

505.03.H - Splicing for Steel H-Piles

SUBSECTION 505.03.H Splicing. Pre-fabricated splicers for splicing steel H-piles.